在线亚洲无码,亚洲国产精品成人,国产精品亚洲а∨无码播放不卡,又大又粗又黄又爽的视频

您好,歡迎來到山東共贏瑞建設(shè)工程有限公司網(wǎng)站!

服務(wù)熱線

13165112299

行業(yè)動態(tài) 當(dāng)前位置:首頁-新聞資訊-行業(yè)動態(tài)濟(jì)南玻璃雨棚:玻璃雨棚的安裝注意事項

濟(jì)南玻璃雨棚:玻璃雨棚的安裝注意事項

發(fā)布時間:2024-05-09 來源:http://szaq365.com.cn/

  濟(jì)南玻璃雨棚的安裝注意事項

Installation precautions for Jinan glass canopy

  玻璃雨棚通常建在大門或陽臺上,常年暴露在戶外,暴露在風(fēng)和陽光下,所以安全性能是玻璃雨棚的一個重要參考標(biāo)準(zhǔn)。如今,玻璃雨棚市場上的太多了,濟(jì)南不銹鋼制品玻璃雨棚如何能夠脫穎而出,成為一個高調(diào)的,這自然有其原因。以下是對玻璃雨棚建設(shè)10大建設(shè)要點的詳細(xì)介紹。

Glass canopies are usually built on doors or balconies, exposed to the outdoors all year round, exposed to wind and sunlight, so safety performance is an important reference standard for glass canopies. Nowadays, there are too many brands in the glass canopy market, and there are naturally reasons why Jinan stainless steel products can stand out and become a high-profile brand. The following is a detailed introduction to the 10 key construction points for glass canopies.

  1.加工準(zhǔn)備和下料:根據(jù)施工圖的放樣和放樣,標(biāo)記材料時應(yīng)預(yù)留焊接收縮和加工余量,模板采用放樣。鋼筋校正:鋼筋在下料前需要校正,校正后的偏差值不應(yīng)超過規(guī)范規(guī)定的允許偏差值,以保證下料質(zhì)量。熱加工型鋼應(yīng)進(jìn)行熱加工,冷卻后鉆孔。鋼板預(yù)埋件和其他部件切割、鉆孔并噴涂防腐漆。

1. Processing preparation and cutting: According to the layout and layout of the construction drawing, welding shrinkage and processing allowance should be reserved when marking materials, and the template should be set out. Reinforcement correction: Reinforcement needs to be corrected before cutting, and the deviation value after correction should not exceed the allowable deviation value specified in the specifications to ensure the quality of cutting. Hot worked steel should be hot worked and drilled after cooling. Cutting, drilling, and spraying anti-corrosion paint on steel plate embedded parts and other components.

  2.濟(jì)南不銹鋼制品廠家測量放線:根據(jù)土建標(biāo)高基準(zhǔn)線,測量預(yù)埋件的標(biāo)高線,并檢查預(yù)埋件的標(biāo)高偏差和左右偏差。整理結(jié)果后,確定預(yù)埋件分離的調(diào)整和處理方案。沿地板外彈出的墨線設(shè)置預(yù)埋件的頂部標(biāo)高線。

2. Jinan stainless steel product manufacturer measurement and layout: Based on the civil engineering elevation reference line, measure the elevation line of the embedded parts, and check the elevation deviation and left and right deviation of the embedded parts. After organizing the results, determine the adjustment and handling plan for the separation of embedded parts. Set the top elevation line of the embedded parts along the ink line popping out of the floor.

  3.預(yù)埋件安裝處理:定位預(yù)埋件安裝位置、鉆孔及安裝。預(yù)埋件應(yīng)定位準(zhǔn)確,埋設(shè)牢固。標(biāo)高偏差不大于9毫米,左右位移不大于20毫米。

3. Installation treatment of embedded parts: locate the installation position of embedded parts, drill holes and install them. The embedded parts should be accurately positioned and firmly embedded. The elevation deviation shall not exceed 9 millimeters, and the left and right displacement shall not exceed 20 millimeters.

fccadf844dd6d0041399b15be911887

  4.吊臂的安裝和焊接:吊臂的安裝采用焊接,焊接需要在檢查焊接節(jié)點和調(diào)整吊臂的設(shè)計坡度后才能進(jìn)行。在一側(cè)的一個懸架臂精細(xì)定位后,在另一側(cè)安裝一個懸架臂,并在點焊之前將其精細(xì)定位。然后,基于這兩個懸架臂,拉出懸架臂的高標(biāo)高線和低,并逐個焊接其余的懸架臂。焊接無縫鋼管。當(dāng)型鋼需要加長時,焊接接頭并將其拉直。當(dāng)使用鋼接頭時,為了使接頭鋼與鋼板預(yù)埋件相互靠近,應(yīng)按設(shè)計要求鏟去邊角。對接焊縫應(yīng)在焊縫兩端用弧形板焊接,弧形板的材質(zhì)和波形與焊接件相同,焊接后用氣割切斷并打磨光滑。

4. Installation and welding of the lifting arm: The installation of the lifting arm adopts welding, and welding can only be carried out after inspecting the welding nodes and adjusting the design slope of the lifting arm. After fine positioning one suspension arm on one side, install another suspension arm on the other side and fine position it before spot welding. Then, based on these two suspension arms, pull out the high and low lines of the suspension arms, and weld the remaining suspension arms one by one. Welded seamless steel pipe. When the section steel needs to be extended, first weld the joint and straighten it. When using steel joints, in order to make the joint steel and steel plate embedded parts close to each other, the edges and corners should be removed according to the design requirements. The butt weld should be welded with an arc-shaped plate at both ends of the weld. The material and waveform of the arc-shaped plate should be the same as that of the welded part. After welding, it should be cut off by gas cutting and polished smooth.

  5.校準(zhǔn)檢查:安裝好吊臂后,檢查現(xiàn)場連接部件的質(zhì)量。吊臂的安裝質(zhì)量主要檢查吊臂垂直面的垂直度,懸臂垂直面的一側(cè)在壓力下下垂,懸架臂的傾斜度。確保懸架臂滿足設(shè)計應(yīng)力狀態(tài)和整體穩(wěn)定性要求。

5. Calibration inspection: After installing the boom, first check the quality of the on-site connecting components. The installation quality of the suspension arm mainly checks the verticality of the vertical surface of the suspension arm. One side of the vertical surface of the cantilever hangs under pressure, and the inclination of the suspension arm. Ensure that the suspension arm meets the design stress state and overall stability requirements.

  6.連接承重電纜:定位拉桿基準(zhǔn)線和標(biāo)高線,按要求安裝預(yù)埋件,焊接欄桿。

6. Connect load-bearing cables: locate the reference line and elevation line of the pull rod, install embedded parts as required, and weld railings.

  7.不銹鋼玻璃爪的安裝和焊接:根據(jù)設(shè)計尺寸彈出縱橫線和設(shè)計標(biāo)高,用夾具夾緊,進(jìn)行定位點焊組裝后,焊接玻璃爪座。

7. Installation and welding of stainless steel glass claws: Draw vertical and horizontal lines and design elevations according to the design dimensions, clamp with fixtures, perform positioning spot welding assembly, and weld the glass claw seat.

  8.防銹漆處理:應(yīng)熔渣和飛濺物,不銹鋼零件表面應(yīng)多次噴涂白色油漆。涂層和薄膜厚度應(yīng)符合設(shè)計要求或施工規(guī)范。不得遺漏臨邊型鋼內(nèi)側(cè)的油漆。

8. Anti rust paint treatment: slag and splashes should be removed, and the surface of stainless steel parts should be sprayed with white paint multiple times. The coating and film thickness should meet the design requirements or construction specifications. Do not omit the paint on the inner side of the edge steel.

  9.夾膠玻璃加工制作安裝:根據(jù)設(shè)計要求和實測尺寸,確定玻璃的尺寸及其水平和垂直位置,由制造商制造。安裝不銹鋼玻璃卡爪,玻璃臨時固定后進(jìn)行調(diào)整。調(diào)整標(biāo)準(zhǔn)為水平、垂直和水平。偏差不得超過規(guī)定的偏差。

9. Processing, production, and installation of laminated glass: Based on design requirements and measured dimensions, determine the size of the glass and its horizontal and vertical positions, and manufacture it by the manufacturer. Install stainless steel glass clamps and adjust the glass after temporary fixation. Adjust the standards to horizontal, vertical, and horizontal. The deviation shall not exceed the specified deviation.

  10.調(diào)整檢驗:對點式玻璃進(jìn)行整體調(diào)整檢查,調(diào)整標(biāo)準(zhǔn)為水平、垂直、水平。偏差不得超過規(guī)定的偏差。

10. Adjustment inspection: Conduct an overall adjustment inspection on the point glass, with adjustment standards of horizontal, vertical, and horizontal. The deviation shall not exceed the specified deviation.

本文由濟(jì)南玻璃雨棚提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請點擊我們的網(wǎng)站http://szaq365.com.cn我們將會全心全意為您提供滿意的服務(wù)。

This article is supported by Jinan Glass Canopy. For more detailed and exciting content, please click on our website http://szaq365.com.cn We will wholeheartedly provide you with satisfactory service.

激情五月丁香五月| 久久网站www香蕉秀| 一本色道久久HEZYO无码| 无码在线视频免费| 国产午夜无码专区喷水| av婷婷网| 3p国产视频| 人妻蹂躏无码av一二三区| 激情偷乱人伦| 亚洲av.com| 久久久久亚洲AV无码网站| 一级毛片在线播放| 久久亚洲无码一区| 精品女厕偷拍视频一区二区| 加勒比欧美丰满| 国产一区二区在线视频| 91精品人妻一区二区三区蜜臀| 色偷偷人人澡人人爽人人模| HDXXXXvideo天美传媒| 国产亚洲欧美一区二区| a√精品| 奶头好大揉着好爽H公交| 久久久老熟女一区二区三区91| 最近中文字幕mv免费高清在线| 国产成人久久久| 啪啪网免费视频| 国产亚洲精品女人久久久久久| 中文字幕综合| 国产成人无码www免费| 男人的天堂久久| 亚洲无码91| www.蜜桃av| 男女精品久久久| 亚洲AV无码国产毛片久久春色| 91精品国产一区二区三密臀| 天天看av| 熟妇内谢69XXXXXA片| 无码不卡在线| 国产精品日本一区二区在线播放| 久久久一区二区三区捆绑sm调教| 无码最新|